Services

Bergteamet at your service!

Bergteamet, as a professional partner in the mining industry, has produced more than 175,000 meters of tunnels and ramps, installed over 2 million rock reinforcement bolts, and covered over 1 million square meters with sprayed concrete.

 

We have developed close relationships with our customers and their respective areas of operation, resulting in deeper knowledge of their specific needs and goals. We maintain close dialogue with our clients to ensure that we understand their needs and deliver the right service at the right time at the agreed price.

 

We utilize modern technology by constantly upgrading and replacing machinery, equipment, and methods. We hire and train competent personnel. In close collaboration with our customers and suppliers, we aim to be at the forefront by being safer, faster, and always improving!

Tunnel- and mining operations

Read more about our services. Tunneling, dynamic reinforcement and other mining operations.

Shaft and special project

Read more about our services. We create and renovates shafts.

Machine fleet and service

Read more about our machine fleet and service organization.

Here you can read more about various projects we have worked on over the years. The magazine is published in swedish.

Accurate blasting operation for the new bus terminal in Katarinaberget
In the rebuilding of the Slussen area in Stockholm, the new bus terminal in Katarinaberget with many entrances and connections is an important part of the solution.
Read more
Air-driven Simba yields successful results
At the beginning of the year, Bergteamet carried out rock drilling work for LKAB in Malmberget. Over three months, approximately 6000 meters were drilled with a Simba M6 long-hole rig equipped with an air-driven down-the-hole hammer.
Read more
Eight shafts for the European route E4, Stockholm bypass
Read more
Cable Bolt Rig for shafts
A completely unique machine of its kind has been developed by Bergteamet. It will be used for rock reinforcement of narrow shafts where cable bolts are to be installed.
Read more
New gold minte opened in Fäbodtjärn
May 2 2024 was an historic day. That was when the very first blast was fired to begin tunneling toward the ore in Fäbodtjärn.
Read more
Challenging reinforcement work in Malmberget
Due to seismic events in 2022, a crack appeared in one of the pillars, in the ore body Partas, close to the underground winder in Malmberget. Bergteamet fixed the crack and reinforced the room during the summer and autumn.
Read more
Cement rings strengthens ventilation shafts in the Renström mine
A new method using reinforced cement rings was employed when a new ventilation shaft was raisebored in the Renström mine last summer. Rock pressure is high at the site location and rock conditions are challenging.
Read more